Call Us

+86-20-86346009
+86-13926269719
Hot Sell 100L Cosmetic Reaction Vessel Production Equipment Blender Mixer Homogenizer
You are here: Home » Products » Vacuum Emulsifier » Hot Sell 100L Cosmetic Reaction Vessel Production Equipment Blender Mixer Homogenizer

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Hot Sell 100L Cosmetic Reaction Vessel Production Equipment Blender Mixer Homogenizer

Inspection steps for electrical components when using a vacuum emulsifier:
The first thing to check is the protective grounding circuit of the vacuum emulsifier to ensure that the protective circuit wires are securely connected;
Secondly, check the insulation resistance between the power circuit wires and the protection circuit wires of the vacuum emulsifier, which must not be less than 1MQ; Finally, all circuit wires and protective circuits must undergo a voltage withstand test before they can continue to be used normally;
3. Finally, check the measuring instruments, displays, and control instruments of the vacuum emulsifier to ensure that they are accurate, reliable, and easy to operate. When buying a vacuum emulsifier, please go to Sipuxin, who guarantees professionalism, low prices, and quality reputation!
Video outgoing-inspection:
Core Components:
After-sales Service Provided:
Keywords:
Color:
Availability:
Quantity:
  • SPX-035

  • SIPUXIN

Product Description

Even if the buyer does not need to install it themselves, it is still good to understand it.

Knowledge of installation process for reaction pot

1. The reaction pot should be installed on a sturdy and flat workbench, and the height of the workbench should be determined according to the usage situation. There should be a certain space around the equipment and workbench

(>360cm), For installation and later maintenance.

2. During installation, it is required that the transmission shaft be perpendicular to the ground level, and the non perpendicularity (inclination) should not exceed 1/1000 of the total height of the reaction pot.

3. The self-contained components and safety valves on the various process connections of the reaction vessel must be equipped according to the requirements of the reaction vessel.

4. After installation, check whether all connecting components and transmission parts are firm and reliable. Conduct air tightness tests on all connecting pipes, pipe openings, seals, and the entire machine, and there should be no bubbles, bubbles, drips, or leaks.

5. Before starting up, inject 46 # mechanical oil into the reducer. Open the motor protective cover and manually rotate the fan blades to check for any jamming or scraping of the mixing blade. Clean the dirt inside the kettle before starting up. Only after 30 minutes of empty operation without any abnormal noise or vibration, can the material be officially put into production. Regularly replace the reducer oil of the reaction vessel depending on the production situation.





Previous: 
Next: 

Related Products

Inquiry

QUICK LINKS

Home

PRODUCT CATEGORY

Vacuum Emulsifier
Capping Machine

CONTACT US NOW

 Email:shirley@gzspx.com
                 spx@gzspx.com
 Tel:+86-20-86346009
 WhatsApp:+86-13926269719
 Skype: vivian8spx
Copyright 2022 Guangzhou Sipuxin Light Industry Machinery Co.,Ltd.   Sitemap   Support By Leadong